Deck Removal & Demolition in Burbank, CA

AMI Junk Hauling Truck
Deck Dismantling & Complete Haul-Away! 🔨FREE ESTIMATE
AMI Removal Specialist with Crowbar
Planks, Rails & Concrete Footings Cleared 🏗️(209) 583-9743
AMI Removal Specialist with Dolly
SCROLL DOWN TO CALL THE CREW

Taking down an old deck is harder than it looks. The structure sits tied to your house, anchored deep into the dirt, and loaded with heavy framing. Most homeowners stop when they see the size of the joists, the stubborn hardware, and the sheer volume of old lumber sitting in their yard.

You need a crew that knows how to drop the framing safely without tearing up your yard or damaging your siding. Moving hundreds of pounds of weathered wood across a narrow side yard requires the right tools, plenty of hands, and a solid plan from start to finish.

AMI Junk Hauling handles complete deck demolition and hauling across Burbank. We take apart the railings, decking, joists, and posts, then load everything into our trucks so your yard is clear and ready for your next project.

Population
106,389
County
Los Angeles County
Nearest landmark
Joaquin Miller Park 0.8 mi
Climate zone
South Coast Drng.

complete teardown for weathered and damaged decks

Sun and heat take a heavy toll on outdoor wood framing in Southern California. Over time, strong sun exposure dries out pine and fir decking, causing deep checking, splitting, and cupping. Fasteners back out as the lumber shrinks, leaving loose boards and exposed nail heads across the walking surface.

We see decks at every stage of decay. In the first few seasons, extreme heat dries out the surface finish, causing fine cracks along the grain. By the third year, unsealed wood begins to warp, while winter rains penetrate deep into joist tops where water pools between boards. By the tenth year, heat-damaged flashing permits water intrusion behind the ledger, causing hidden rot along the house rim joist while post bases weaken in dry soil.

We remove single-level ground platforms, elevated second-story structures, multi-tier platforms, and wrapped pool surrounds. We accept pressure-treated framing, weather-checked cedar, composite decking, and rotten fir assemblies. Even if the structure is partially collapsed or unbolted from the home, our crew handles the teardown safely.

Our team works systematically from top to bottom. We pull up damaged footings, remove corroded steel hangers, and clear out rotten ledger boards. We clear away every piece of debris so your wall and yard are completely clear for your new layout.

Navigating tight side yards and hidden utilities

The main obstacle during deck teardown is what sits directly underneath and around the wooden frame. Air conditioner units, gas meters, irrigation manifolds, and window wells are often tucked under joists. Dropping heavy beams without hitting these utilities requires controlled dismantling rather than wild pry-bar work.

Our crew begins at the top and works outward from the house attachment. First, we clear off the railing sections and balusters to create an open workspace. Next, we pull the floorboards off the joists to reveal the main framing underneath. Stairs come down next so we have clear access to the ledger board and main support beams.

We strip the joists from their hangers, drop the main beams off the post caps, and unbolt the ledger board from the house rim joist last. Keeping the ledger attached until the very end keeps the frame rigid and prevents unexpected collapses toward your home exterior.

Narrow side gates, concrete steps, and low-hanging trees mean every piece of wood must be carried out manually. We cut long joists and posts into manageable lengths before carrying them out to the truck. A magnetic sweep across the turf collects loose screws, hidden nails, and structural hardware before we depart.

Factors that shape your demolition quote

Your property layout and the size of your structure dictate the total effort needed for removal. We evaluate job sites individually because static pricing tables cannot capture access hurdles, material weights, or structural height differences. The physical approach to the work zone sets our baseline effort before any labor begins.

A second-story structure off a rear kitchen demands staging, fall protection, and controlled lowering of long beams. Ground-level platforms on open lawns move quickly, while enclosed courtyard builds require long hand carries down narrow access corridors. The total square footage directly controls the volume of construction waste heading to disposal sites.

Material composition also shifts our labor requirements. Heavy pressure-treated joists weigh significantly more than aged cedar, while dense composite boards require more saw cuts during teardown. If concrete footings must be pulled from dry soil using mechanical jacks, that extra labor is included in your detailed quote.

Obstacles underneath the platform, such as gas lines or heat pumps, require careful hand disassembly. We provide clear upfront pricing after gathering your project details so you know what the job entails before work starts.

Step-by-step process for deck teardown

1. Initial inquiry. Contact our team with details about your outdoor deck. Tell us about the deck surface area, height off the ground, and construction materials so we can evaluate your teardown needs.

2. Photo evaluation. Send clear photos showing the deck structure, railing layout, height above ground level, house mounting points, and the path to your front driveway. Photos help us spot access restrictions or delicate utility lines beneath the framing.

3. Quote confirmation. We send a comprehensive written quote detailing the labor, dismantling strategy, and full haul-away service. You review the scope and schedule a project time that fits your plans.

4. Crew arrival and site setup. Our crew arrives on schedule with saws, pry bars, jacks, and safety gear. We set up drop zones and clear a safe path through your yard to the haul vehicle.

5. Controlled teardown. We dismantle the structure from the outer handrails down to the structural posts. The ledger board comes off the wall with care, leaving the underlying siding intact and ready for your contractor.

6. Final site cleanup. We pack all lumber, hangers, metal fittings, and trash into our truck. Our team runs a magnetic sweep across your lawn and sweeps the work area clean before leaving.

Permits and house wall expectations

Removing attached outdoor structures may require building review depending on structural height, footprint changes, or local property guidelines. If you are replacing your old framing with a modern patio or new additions, your primary replacement permit usually covers the initial structural teardown. Property owners can check current local construction rules directly with the California Legislative Information site for state property and building guidelines.

Removing the structural ledger board exposes the house rim joist and original building envelope. Decades of rain often hide behind poorly flashed framing. Our team removes ledger bolts without tearing up adjacent siding, but we do not install structural flashing, repair rotted sheathing, or apply new exterior finish materials.

We recommend having a framing contractor or siding specialist scheduled if you suspect water penetration behind the existing ledger board. Closing penetrations and sealing the house exterior after ledger removal is essential to maintain weather tightness before the next rain season.

How we sort and dispose of deck debris

Pressure-treated framing contains chemical preservatives that prevent ground rot and insect attack. Because of these chemical treatments, treated structural posts and joists cannot be burned or dropped at green-waste composting centers. We transport all pressure-treated lumber directly to licensed construction and demolition processing hubs.

Composite decking boards contain mixed wood fibers and synthetic polymers. These materials are kept separate from clean timber streams and hauled to designated municipal processing centers for construction debris. Metal components like galvanized steel joist hangers, structural lag bolts, post anchors, and aluminum railing systems are removed during teardown and sorted into scrap metal recovery streams.

When concrete footings are pulled out of the ground, we break them down and haul them to aggregate processing sites where masonry is crushed for recycled base rock. Untreated natural cedar or redwood decking without thick paint finishes is separated for wood recovery whenever local facilities permit.

Demolition on a sloped hillside lot

A homeowner near the Verdugo Mountains foothills needed an old multi-level pine deck removed before installing a concrete paver patio. The existing structure stood eight feet off the ground at its highest point, backed against a steep slope with an air conditioner unit sitting directly underneath the main support beam.

The crew set up fall protection equipment and built a controlled lowering system to hand down twenty-foot structural beams without disturbing the cooling system below. Access to the street required navigating a four-foot wide side yard path past utility meters, so all framing was cut into manageable six-foot lengths right at the site.

In six hours, the crew dismantled the railings, floorboards, joists, and main post supports. The ledger board was unbolted cleanly from the stucco exterior, and the footings were cut level with the grade line. The crew ran a magnetic sweep along the side path, loading three tons of construction waste into the truck for proper facility disposal.

Need an old deck removed from your property?

Homeowners preparing for landscape projects, real estate agents clearing inspector callouts, landlords upgrading rental properties, and buyers clearing space for new patios all rely on our crew. If your framing is warped, rotted, or simply in the way of your backyard plans, we take care of the heavy lifting. AMI Junk Hauling makes structural teardown simple by taking down the old frame and hauling away every bit of construction debris in one quick visit. Send photos of your structure through our quick quote form, or call us today at (209) 583-9743 to discuss your project and get a straightforward price quote.

Deck Removal & Demolition in Burbank: questions

Do you pull out the concrete footings?
We cut post bases flush with grade by default. If your project plan requires complete footing removal for excavation or paving, let us know early so we can bring heavy jacks and concrete breaker tools.
What happens to the house wall after the ledger board comes off?
We remove lag bolts carefully and clear away damaged flashing. Sealing lag holes, replacing rotted sheathing, and patching exterior siding requires a qualified carpenter or siding.
Can you dismantle an elevated second-story deck?
Yes. Our crew uses scaffolding, fall restraint gear, and rigging straps to lower elevated structural members safely without damaging lower-level windows or landscaping features.
Is composite decking processed differently than wood framing?
Yes. Composite materials contain plastic polymers mixed with wood flour, so they are routed to heavy construction waste streams rather than standard wood processing sites.
Will you leave nails or metal hardware in my yard?
No. We run heavy-duty magnetic sweeps across lawns, dirt patches, and access walkways after loading to capture loose nails, screws, and metal bracket fragments.
Can you remove part of a deck while leaving the rest intact?
Yes. We can remove damaged sections or cut back platforms, provided the remaining structure retains proper posts, ledger attachments, and structural balance after the cuts.

Get a quote in Burbank

Tell us what you have and where it sits. We handle the loading.

No obligation. We come to you and quote on the spot.