Deck Removal & Demolition in Farmington, NM

AMI Junk Hauling Truck
Deck Dismantling & Complete Haul-Away! 🔨FREE ESTIMATE
AMI Removal Specialist with Crowbar
Planks, Rails & Concrete Footings Cleared 🏗️(505) 572-0756
AMI Removal Specialist with Dolly
SCROLL DOWN TO CALL THE CREW

Taking down an old deck is physical work that stops most homeowners before they strip the first joist. The lumber is heavy, full of rusty screws, and firmly attached to your home siding. Stripping the top boards is only the beginning. You still face heavy support beams, concrete footings sunk into hard ground, and piles of weathered wood that your weekly trash service will not pick up.

We take down aged, unsafe, or unwanted decks across Farmington. Our crew dismantles the structure piece by piece, controls the drop zone, pulls out the structural ledger, and loads every scrap onto our trucks. You do not need to haul heavy demolition waste or figure out where to dump treated lumber. AMI Junk Hauling handles the tear down, carrying, loading, and disposal so your yard is clear and ready for your next project.

Population
46,362
County
San Juan County
Nearest landmark
Farmington Historical Marker 0.0 mi
Climate zone
Northwestern Plateau

Deck Demolition and Teardown in Farmington

High-altitude sunlight and thin air accelerate timber breakdown across the high desert. Intense ultraviolet radiation dries out wood fibers, breaking down surface sealants and causing deep radial cracks along structural joists. As moisture drains out of the timber, boards warp, cup, and twist out of alignment. Fasteners back out of the wood as the grain opens, leaving loose deck boards and exposed nail heads. Sudden thermal drops during high-desert winter nights cause trapped moisture inside end grains to expand, splitting posts and weakening beam joints year after year.

We handle deck teardown projects for structures in any stage of decay or structural failure. Whether your deck is partially collapsed, unstable, or simply unwanted, our team dismantles it safely. We remove multi-level wooden decks, ground-level platforms, composite installations, and elevated structures off second-story doors.

  • Weathered, split, and severely checked pine or fir decks
  • Structures with rotted posts, sagging support beams, or loose footings
  • Decks attached with corroded lag bolts or failing ledger boards
  • Composite decking structures with degraded hidden fasteners
  • Elevated platforms, wooden steps, handrails, and built-in bench seating

We work on freestanding backyard structures as well as attached designs. If your deck has become a safety hazard or stands in the way of a new patio, landscaping project, or home addition, we clear the entire frame away.

How We Safely Access and Dismantle Your Deck

The biggest challenge during a deck disposal job is working around low-clearance yards, established landscaping, and wall-mounted utilities. Homeowners often find that heat pumps, outdoor air conditioning units, gas lines, or irrigation manifolds sit directly beneath or beside the structural frame. Free-falling heavy timbers in these tight spaces risks severe damage to your home mechanical systems and siding.

We manage access by bringing portable demolition equipment and tearing down the deck systematically from the outside inward. Our crew starts by unfastening or cutting away railings and perimeter stairs to clear a clean walking path. Next, we strip the top decking boards using heavy wrecking bars. Each board is cut into manageable lengths right on the frame so it can be carried out by hand without dragging sharp wood across your lawn or garden beds.

Once the walking surface is gone, we support and remove the joists, beams, and support posts. The ledger board attached to your house rim joist comes down last. Removing the ledger last ensures the main structure stays stable while the crew is working. If your deck is elevated above ground level, we use controlled lowers or chute runs to bring components down safely. After all structural lumber is loaded into our trailer, we run a magnet sweep across the entire work zone to pick up loose nails, structural screws, and metal brackets.

Factors That Determine Your Deck Removal Quote

We do not publish fixed rate sheets because every deck removal depends on the size of the structure, how it was built, and site access. The overall footprint of your deck and its height above grade directly shape the labor required to take it down. A ground-level platform takes fewer hours than a multi-level deck attached to a second-floor doorway that demands extra safety equipment and controlled lowering.

The materials used in your construction also affect the total workload. Heavy composite decking materials are much heavier than standard dimensional lumber and require extra haul capacity. The presence of built-in features like high railings, covered pergolas, multi-tiered stairs, or thick concrete footings that must be dug out will expand the scope of work.

Site conditions matter just as much as square footage. A tight side yard, steep slope, or long carry distance from the deck to our truck adds time to the loadout process. Tearing out ledger boards that require careful detachment from home siding also requires more detailed work. We look at all these elements to give you a clear, upfront quote before any work starts.

How to Schedule Your Deck Teardown

Clearing an unwanted deck from your property is simple when you follow these four steps to start your project:

1. Send project details. Take photos of your deck from a few angles, including the area underneath and the path to your driveway. Send these photos along with approximate dimensions to our team through our contact form or phone line.

2. Receive your quote. We evaluate the overall size, structural layout, access points, and estimated weight of your deck. You get an all-inclusive quote covering all tear down labor, heavy carrying, magnet sweeps, and waste hauling costs.

3. Prepare the workspace. Before our crew arrives, clear off all patio furniture, grills, planters, and personal items from the deck surface and the area underneath. Make sure gate entrances are unlocked and pets are kept indoors during work hours.

4. Complete the removal. Our crew arrives on schedule with structural saws, wrecking bars, and safety gear. We dismantle the deck, load all materials into our truck, perform a thorough magnet sweep for metal fasteners, and leave your yard clean.

Permits and Structural Work Considerations

Removing a structural deck attached to your home often involves local building regulations and property modification rules. In many local jurisdictions, taking down an attached architectural feature or changing a home exterior footprint requires a residential demolition or alteration permit. If you are planning to build a new patio or replacement deck immediately after removal, the permit issued for the new construction frequently covers the tear down phase of the existing frame. Checking with your local municipal planning office before work begins ensures your project remains fully compliant with regional land use standards.

Detaching a ledger board from a house rim joist requires careful handling. The ledger is usually anchored deep into your structural framing using heavy lag screws or through-bolts. Removing these fasteners leaves bolt holes in your exterior siding and exposes the underlying house sheath. In many cases, old decks hide moisture damage or rot that occurred behind aged flashing long before removal day. Once our crew unbolts the ledger and clears the frame, closing the exposed wall, replacing damaged siding, and applying weather-tight flashing is a specialized carpentry task that should be addressed promptly by a building contractor to seal your home exterior against weather exposure.

Self-Haul vs Deck Teardown

Taking on a DIY deck removal can make sense if you own a low, ground-level platform built with standard screws, have access to a heavy-duty pickup truck or utility trailer, and have experience using reciprocating saws and pry bars. If you have open weekend time and helping hands to carry heavy timbers, handling the labor yourself avoids contractor fees.

However, self-haul projects often run into frustrating hurdles once work begins. Standard pickup beds fill up fast; even a small ten-by-twelve deck yields enough bulk lumber, joists, and railing posts to fill multiple truck loads. Landfills treat pressure-treated lumber as construction and demolition waste, which means higher tip fees and strict dumping regulations. You must also pull hundreds of bent nails and rusted structural screws by hand or risk puncturing your truck tires at the unloading site.

Tearing down elevated decks or structures attached to your house siding carries real physical risk. Pry bars can slip, heavy support beams can drop unexpectedly, and improper detachment of the ledger board can rip away house siding or damage hidden rim joists. Renting demolition tools, buying blade replacements, paying fuel costs for repeated trips, and paying landfill gate fees quickly shrink your expected savings. Hiring AMI Junk Hauling eliminates the physical strain, preserves your property from accidental damage, and clears all debris in a single visit.

Where Your Old Deck Material Goes

Deck dismantling generates several distinct waste streams, each requiring specific handling. Dimensional framing, joists, and decking made from pressure-treated lumber are treated with preservative chemicals like copper azole or alkaline copper quaternary. Because of these chemical treatments, pressure-treated wood cannot be processed into garden mulch, sent to biomass wood chippers, or burned in open fires. All treated lumber is separated and hauled to licensed construction and demolition landfills that accept treated building materials.

Composite decking boards, which consist of a blend of recycled wood fibers and dense plastics, follow a separate disposal path. Synthetic materials cannot be mixed with clean green waste, so composite pieces are grouped with general demolition waste. Metal hardware is separated on site whenever possible; galvanized steel joist hangers, lag bolts, structural screws, iron brackets, and aluminum railing sections are sorted for metal recycling facilities. If concrete footings are pulled out during your project, the broken concrete is crushed and routed to local aggregate recyclers for reuse as road base or clean fill material.

High Desert Deck Teardown Project

A property owner called us to clear an unsafe, split-level wooden deck attached to the rear of a two-story home. Years of intense high-desert sunlight had severely checked the upper decking boards, while dry rot had compromised the primary ledger connection along the house wall. The deck spanned over an outdoor air conditioning condenser unit, making drop-zone control critical to prevent mechanical damage.

Our two-person crew arrived with reciprocating saws, wrecking bars, and fall protection equipment. We began by removing the upper perimeter railings and stair stringers, cutting them into four-foot sections. Working above the air conditioning unit, the crew used hand-to-hand lowers to move heavy crossbeams safely away from the mechanical casing without dropping any structural elements.

After stripping the main decking, we unbolted the joists from their metal hangers and removed the main ledger board from the house rim joist. The post bases were cut flush with the ground line per the customer request. In under six hours, the crew loaded all treated lumber, composite trim, and rusty hardware into our trailer, finished with a double-pass magnet sweep across the dry dirt yard, and left the house wall exposed for incoming siding repairs.

Is Your Weathered Deck Ready to Come Down?

Homeowners, property managers, and real estate buyers call us when an aging deck becomes a structural hazard, fails a home inspection, or stands in the way of outdoor renovations. If your wooden platform is rotting, warping, or simply taking up valuable yard space, trying to dismantle it alone with a crowbar and a pickup truck quickly turns into days of exhausting labor. makes clearing your outdoor space straightforward with scheduled teardowns, careful site management, and complete waste removal.

We arrive with the proper demolition tools, clear tight yards without damaging your home siding or utilities, and haul away every board and metal fastener in one visit. Send your deck photos through our online form, or call us mid-sentence right now at (505) 572-0756

to discuss your structure with our team. We will evaluate your project details, provide an upfront estimate, and set up a convenient day to tear down your deck and clear your yard.

Deck Removal & Demolition in Farmington: questions

Do you take the concrete footings out too?
By default, we cut structural posts flush with the ground line or slightly below grade to leave a smooth surface. If your project requires complete footing removal for new excavation or landscaping, we can dig out and pull the concrete footings using heavy wrecking bars. Complete footing removal involves extra labor and heavy concrete disposal, so let us know your goals during the initial quote call.
What happens to the wall where the deck was attached?
When we unbolt the ledger board, the structural wall of your home is exposed. We carefully back out lag bolts and remove joist hangers to minimize siding damage. However, removing the ledger leaves open bolt holes and exposes the original sheathing. Sealing the wall, replacing missing siding, and installing new weather flashing is specialized carpentry work that should be handled by a general contractor after demolition.
Can you remove a second-story deck?
Yes, we frequently dismantle elevated and second-story decks. Our team uses controlled lowering methods, rigging, and safety harnesses to take apart elevated platforms piece by piece. We ensure that no heavy lumber drops uncontrollably, protecting your lower-level patio, siding, windows, and ground-level landscaping throughout the teardown process.
Do I need a permit for deck demolition?
Permit rules vary depending on whether the deck is attached to your home structural frame and its overall height above grade. In many areas, removing an attached structure requires a basic residential demolition or alteration permit. If you plan to build a new deck or patio in the same footprint, the new construction permit often covers the removal of the old structure.
Can you work around an air conditioner or gas meter underneath?
Yes, working around ground-level utilities is a common requirement during deck demolition. We do not drop heavy timbers over sensitive areas. Instead, our crew unfastens decking boards individually and hand-carries structural beams away from air conditioning condensers, gas lines, basement window wells, or irrigation manifolds to prevent any equipment damage.
Will you leave nails or screws in my yard?
No, keeping your yard safe for pets and foot traffic is part of our service. After all lumber and structural components are loaded into our trucks, we conduct a magnet sweep across the entire demolition zone, work path, and driveway staging area to catch loose nails, structural screws, and metal brackets.
What happens to the removed deck materials?
Materials are sorted by type for proper disposal. Pressure-treated dimensional lumber and composite boards are taken to licensed construction waste handling facilities, as chemical treatments prevent them from being chipped or burned. Metal components like joist hangers, post brackets, lag bolts, and aluminum railings are set aside for local scrap metal recycling.

Get a quote in Farmington

Tell us what you have and where it sits. We handle the loading.

No obligation. We come to you and quote on the spot.

Nearby towns we serve

  • Flora Vista, NM8.9 mi
  • West Hammond, NM10.2 mi
  • Lee Acres, NM10.3 mi
  • Bloomfield, NM13.0 mi
  • La Plata, NM13.9 mi
  • Aztec, NM14.1 mi
  • Shiprock, NM26.2 mi
  • Durango, CO42.2 mi

Other services in Farmington

Explore