Deck Removal & Demolition in Leisure City, FL



An aging deck attached to your home eventually becomes a safety hazard and an eyesore. Splitting boards, rusted joist hangers, and softened support beams make the structure unsafe for family use. We clear away complete wooden and composite outdoor platforms across Leisure City.
Our team handles total structural teardowns rather than light maintenance or surface repairs. We dismantle handrails, step assemblies, structural framing, and ledger boards connected to the exterior wall. Everything gets loaded onto our trucks and hauled off your lot.
Working with AMI Junk Hauling means the whole structure disappears in a single coordinated effort. You avoid the work of pulling hundreds of heavy framing nails or hauling heavy treated lumber to local disposal sites yourself.
- Population
- 27,033
- County
- Miami-Dade County
- Nearest landmark
- Leisure Lake Park
- Climate zone
- Lower East Coast
Decking Structures We Dismantle in the Local Heat and Damp
High humidity, heavy seasonal rainfall, and intense sun take a heavy toll on outdoor wood structures in sub-tropical Florida. Constant moisture soaking into joists creates hidden rot around structural fasteners, while heat warps deckboards and pulls screws straight out of the frame. Termites often attack the underside of ground-level frames where damp soil rests against untreated pine or aged joists. What looks like a sound platform on top can be completely hollowed out underneath.
We accept decks in any state of decay or structural failure. Our crew dismantles platforms made of pressure-treated lumber, natural cedar, weathered pine, or composite materials. We tear down multi-level back door structures, elevated balconies, pool surrounds, ground-level platforms, and simple step structures. It does not matter if the framing is completely rotten, twisted by salt air, or damaged by past storm winds. We handle the teardown safely regardless of structural stability.
We also take down attached additions like built-in benches, wooden railings, privacy screens, and overhead pergolas mounted to the platform. If the structure is held together by rusted lag bolts, overgrown with tropical vines, or half-collapsed from termite damage, we bring the right tools to break it down. Every piece of damaged lumber, rusty metal connector, and loose board is pulled up, cut into manageable sections, and taken off your property.
Navigating Footprints and Tight Work Areas
Physical dimensions and structural height dictate how we dismantle a platform. Ground-level builds allow easy perimeter access, but elevated structures off a back door require systematically removing components from the top down. We start by unbolting railings and removing perimeter decking to create a clear work platform. The joists are then unhinged from the main support beam, and the main beam is lowered carefully to avoid striking nearby walls or landscaping features.
Narrow side yards between houses in local residential tracts often limit equipment access. When space to the driveway is restricted, our crew cuts framing members into shorter lengths that can be carried through tight gate openings. We protect outdoor features like air conditioning condensers, patio slabs, window wells, and low-hanging palm fronds by controlling the drop zone. Material is never dropped blindly from elevated frames.
The attachment point at the house rim joist is handled with extreme care. We back out lag bolts from the ledger board to ensure the siding or stucco wall remains intact. Once all wood components are loaded into the truck, we run heavy-duty magnetic sweeps across the grass and garden beds to collect every dropped nail, staple, and screw.
Factors That Determine Teardown and Removal Quotes
Every teardown job is evaluated based on its specific structural demands, so we do not publish fixed rate tables. The total square footage of the platform and its height off the ground are primary drivers. Elevated second-story structures require safety rigging, controlled lowering techniques, and extra labor time compared to simple low-profile back yard platforms.
The materials used in your build also influence the overall load weight. Pressure-treated wood that has absorbed years of rainfall is significantly heavier than dry cedar or hollow vinyl. High-density composite decking also adds substantial weight to the truck load. Additional built-in items such as custom stairs, heavy timber pergolas, multi-tier railings, and decorative privacy walls increase the total material volume.
Site accessibility plays a key role as well. Long carry distances from a rear garden around tight fence lines to our parked haul vehicle require more manual effort. If concrete post footings must be pulled from the ground rather than cut flat at grade, that extra excavation labor is factored into the initial estimate provided by AMI Junk Hauling.
How to Schedule Your Removal Project
1. Send Project Details. Contact our office with basic details about your structure. Tell us the approximate dimensions, height off the ground, and whether it is constructed from pressure-treated wood or synthetic composite materials.
2. Provide Site Photos. Take pictures of the platform, the space underneath, and the path leading to your driveway or street. Photos help us spot potential access obstacles like narrow side gates, residential fences, or close AC units.
3. Review the Work Plan. We evaluate your photo details and structural layout to calculate labor hours and disposal volumes. You receive an upfront written quote detailing the full scope of teardown and haul-away work.
4. Clear the Workspace. Before our crew arrives, remove all patio furniture, grills, potted plants, and outdoor toys from the surface and immediate surrounding yard area so we can start work right away.
5. Watch the Teardown. Our team arrives with reciprocating saws, pry bars, and safety equipment. We systematically dismantle the handrails, surface boards, support joists, main beams, and wall ledger board in a controlled sequence.
6. Final Yard Sweep. After all lumber and structural metal are loaded onto our haul vehicle, we clear the work area of small debris and run magnets to pick up stray fasteners before leaving your property.
Permit Guidance and Local Demolition Guidelines
Dismantling a structural addition attached to a residential home may require demolition permits or approval from local municipal building departments. Attached platforms link directly to the home framing through a ledger board, so local building officials often want to verify that the wall envelope is properly sealed after removal. If you plan to build a new outdoor space or concrete patio in the same footprint, your contractor's new building permit often covers the removal of the old platform.
Property owners dealing with abandoned structures on rental properties should review standard notice guidelines. Property legal procedures are outlined by the county treasury / county treasurer guidelines for managing tenant property and real estate clearouts. Check local rules before clearing tenant structures.
Once the ledger board is removed, the exposed exterior wall beneath the flashing needs protection from rain. While our crew takes care not to damage your house siding, permanent stucco repair, wall patching, or house siding installation is specialized exterior carpentry that should be handled by a licensed building contractor.
How Demolished Decking Materials Are Processed
Dismantling an outdoor platform generates several distinct waste streams that must be handled separately according to environmental regulations. Pressure-treated lumber contains chemical preservatives that prevent insect attack and rot. Because of these chemical treatments, treated wood cannot be sent to clean-wood processing facilities, converted into garden mulch, or burned. It must go directly to approved construction and demolition debris landfills.
Composite decking materials consist of a dense mixture of recycled wood fibers and thermoplastic resins. Synthetic decking cannot be mixed into standard residential recycling bins or processed as raw wood. We transport composite boards to regional construction waste sites equipped for manufactured building products.
Metal hardware stripped during teardown is separated for metal recycling. Steel joist hangers, heavy lag bolts, structural posts, stair brackets, and aluminum handrail systems are sorted into scrap metal streams. If concrete footings are excavated from the yard, the broken concrete is delivered to local aggregate crushers to be reused as road base fill.
Clearing a Weathered Rear Platform
A homeowner near the local residential park had an elevated pine platform that was built over fifteen years ago. Years of intense sun and heavy rain had rotted the support posts near ground level, causing the outer edge of the frame to sag significantly away from the house wall. The owner wanted the hazardous structure removed so a paver patio could be installed instead.
The work area was located behind a fully fenced back yard with only a narrow three-foot side gate for access. Our crew could not bring heavy machinery to the rear, so the work had to be completed using hand tools and power saws. We established a safe disassembly area on the aging surface, starting by cutting the top handrails and unbolting the perimeter steps.
Each joist was unfastened from the ledger board and cut into six-foot lengths to allow easy passage through the narrow side gate. The crew carried the lumber directly to our haul vehicle parked in the driveway. The rotten posts were unbolted from their footings, and the ledger board was detached from the house rim joist without damaging the underlying wall flashing. The entire site was cleared of old lumber and magnetically swept in under five hours.
Need an Old Deck Removed from Your Property?
Is an old, rotting platform taking up space in your back yard or posing a safety hazard to your family? Homeowners, real estate sellers, property managers, and buyers needing to clear out unsafe structures rely on our team for complete teardown solutions. We take care of all the heavy lifting, structural cutting, and waste loading so you do not have to handle dangerous demolition work yourself.
Reach out to to discuss your project and get a straightforward quote today. Simply send the details through the form on this page, or call and describe it: (786) 964-4049. You get a figure back in writing and can schedule a crew at a time that works best for you.
Deck Removal & Demolition in Leisure City: questions
Do you take out the concrete footings too?
What happens to the house wall after the ledger board comes off?
Can you tear down a second-story platform?
Will you leave loose nails or screws in my lawn?
Is composite decking handled differently than real wood?
Can you complete the teardown work in one day?
Nearby towns we serve
- Naranja, FL
- Princeton, FL
- Homestead, FL
- Florida City, FL
- Goulds, FL
- South Miami Heights, FL
- Richmond West, FL
- Cutler Bay, FL