Deck Removal & Demolition in Yakima, WA

AMI Junk Hauling Truck
Deck Dismantling & Complete Haul-Away! 🔨FREE ESTIMATE
AMI Removal Specialist with Crowbar
Planks, Rails & Concrete Footings Cleared 🏗️(888) 371-8120
AMI Removal Specialist with Dolly
SCROLL DOWN TO CALL THE CREW

An unsafe wood structure behind your house is more than an eyesore. It is a fall risk and a barrier to using your yard. Whether your back porch has soft boards, rusted joist hangers, or footings that shifted, full teardown gets the hazard off your land entirely. AMI Junk Hauling provides full-service deck demolition across the local area.

We do not offer quick touch-ups or partial carpentry work. Our focus is complete structural teardown and haul-away. We disconnect the ledger from your house rim joist, dismantle the railings and stairs, and clear the yard so you can start your next outdoor project.

A crew handles every part of the physical work, including loading the debris, raking the dirt, and hauling the lumber away. You do not need to rent pry bars or haul heavy pressure-treated timbers to the transfer station yourself.

Population
96,794
County
Yakima County
Nearest landmark
Miller Park 0.5 mi
Climate zone
Central Basin

complete Teardown for Damaged and Weathered Decks in Yakima

The high summer heat and dry desert sun split decking boards from top to bottom. Hot weather shrinks pine and fir framing, pulling structural screws away from joists. Winter frost heaves footings that sit in soft soil, lifting one side of the ledger off the wall. Rain and melting snow collect inside open fastener holes, rotting the frame from the inside out while the surface boards look fine.

We handle complete teardown across all conditions, including:

  • Decks with split decking, popped nails, and split joists.
  • Second-story elevated decks attached to upper sliding doors.
  • Structures with sunken posts or concrete piers cracked by frost.
  • Rotting ledgers where water got behind damaged flashing.
  • Weathered composite decking over collapsed wood frames.
  • Unfinished or abandoned yard platforms and patio steps.

Sun exposure bakes pressure-treated wood until it becomes brittle and prone to snapping under load. Once framing timber loses structural strength, replacing a few surface boards will not save the build. Moisture trapped between double joists breeds wood rot that quickly spreads toward the home rim joist. When flashing fails behind the main attachment beam, water leaks directly into your exterior wall cavity. We pull the old timber, strip out corroded metal hangers, and cut posts back to grade so your property is safe, level, and ready for new plans.

Physical Demolition, Ledger Dismantling, and Yard Loading

Every teardown follows a strict sequence to keep the house and yard safe. Work begins at the outer edge with the top railings and stair stringers. Decking boards come off next to give the crew clear access to the supporting frame. Joists are unhung from the main beams one at a time, preventing large sections of lumber from falling onto your lawn or foundation.

The main beam comes down once the joists are cleared, leaving only the support posts and the ledger. Taking the ledger off the house rim joist requires care. We back out lag bolts and through-bolts, cut through rusted structural screws, and ease the board away from your siding to avoid damaging your wall or exterior sheeting. If posts sit in concrete, we can cut them flat at grade or pull the footings out entirely using leverage and heavy bars.

Tight yard access is common in established neighborhoods. If your side gate is narrow, our crew cuts framing timbers down into manageable four-foot lengths. We carry all debris by hand around garden beds, air conditioning units, and gas lines. Once the truck is loaded, we run a magnetic sweep over the entire work area to catch dropped screws, nails, and metal brackets before we pull away.

Factors That Shape Your Structure Demolition Quote

Every backyard setup is different, so we do not publish fixed rate tables. The size of the build is the primary factor that sets your quote. A ground-level platform requires less labor and time than a multi-level structure with tall posts and extensive stairways.

Key variables that impact the total estimate include:

  • Total square footage and height above ground grade.
  • Material type, including pressure-treated wood, natural cedar, or composite decking.
  • Whether concrete footings must be pulled or cut at grade.
  • Access path distance from the structure to our hauling truck.
  • Obstacles under the frame, such as AC units or basement window wells.

Treated wood and composite boards carry weight differently and require specific disposal handling at local facilities. Demolishing elevated structures requires fall protection equipment and controlled dropping methods, which adds labor time. Clearing out heavy concrete piers takes more effort than simply cutting posts flush with the dirt. We review these details upfront so you receive a clear, straightforward written quote before work begins.

How to Schedule Your Deck Teardown

1. Contact our office. Call our team or submit your project details online with pictures of your old structure and the surrounding yard area.

2. Review your estimate. We analyze the photos, structure height, and access path to send you a clear written quote without hidden fees.

3. Set a teardown date. Pick a date that works for your schedule. We coordinate crew arrivals to match your timeline.

4. Clear the work zone. Remove outdoor furniture, grills, planters, and personal items from on top of and beneath the wood platform before our crew arrives.

5. Watch the removal. Our crew dismantles the deck from the top railings down to the ledger and footings, loading every piece directly into our truck.

6. Final site inspection. We sweep the work zone with heavy magnets to pick up loose nails, collect stray wood chips, and leave your yard clear.

Local Permitting and Wall Prep After Teardown

Removing a major backyard structure often intersects with local residential building rules. While smaller ground-level platforms might not require formal municipal oversight, attached structures or elevated platforms above a certain height usually involve local building permits. If you plan to build a new porch or paver patio immediately after teardown, your new construction permit often covers the removal of the existing structure. Homeowners can verify current project requirements directly through the state legal portal or their local city planning office.

Removing the ledger board reveals the hidden condition of your house siding and rim joist. If water has breached the old flashing over past winters, you may find soft wood or missing weather barriers behind the main beam. Our crew removes all structural fasteners, lag bolts, and ledger hangers cleanly. Closing penetrations, installing fresh flashing, or replacing rotted house siding is specialized finish carpentry work that should be arranged with your building contractor right after we finish the tear out.

Sorting and Recycling Demolition Debris

Backyard structures contain several distinct material streams that must be handled correctly. Pressure-treated framing lumber is treated with chemical preservatives to resist insects and rot. Because of these chemical treatments, old treated timber cannot be burned or dropped at green-waste composting sites. It goes directly to licensed construction and demolition waste facilities.

Composite boards are made from a mix of recycled plastics and wood flour. They do not blend into standard wood recycling streams and are separated for specific disposal handling. Untreated cedar or pine railings, when free of heavy paint, can sometimes be diverted to wood recycling processing.

All metal components are completely separated during dismantling. Galvanized joist hangers, steel lag bolts, flashing strips, and aluminum railing posts are hauled to local scrap metal processors. If your project includes pulling concrete footings out of the ground, those heavy piers are crushed and processed at local aggregate recycling yards to be reused as clean road base.

Standard Yard Demolition Project Example

A homeowner wanted to remove an aging 12-by-16-foot pressure-treated pine platform attached to the back of their residence. High summer heat had warped the top boards, while moisture trapped along the north-facing ledger had rusted out the joist hangers. A central AC compressor sat directly under the outer framing edge, making it impossible to drop large sections of timber straight down without damaging home equipment.

Our two-person crew arrived with reciprocating saws, pry bars, and timber carts. They started by unbolting the perimeter handrails and hand-carrying the top boards to the truck. Working carefully above the AC unit, the crew supported the joists individually as they cut them away from the ledger and outer beam. The ledger was unbolted from the home exterior without tearing the underlying building wrap. The team cut four support posts flat at grade, swept the lawn with a rolling magnet to clear dropped fasteners, and completed the full job in under six hours.

Need an Old Deck Removed from Your Property?

Is your old outdoor platform rotting, sagging, or blocking your next yard renovation? Homeowners, real estate agents preparing houses for sale, property managers clearing safety risks, and buyers inheriting broken structures rely on us for fast demolition. Contact AMI Junk Hauling to handle the heavy tearing, loading, and hauling today.

Send your project details and photo pictures through our online form, or call directly at (888) 371-8120 to discuss your structure. We provide clear upfront pricing, schedule a convenient pickup time, and dispatch an experienced crew to clear your backyard completely.

Deck Removal & Demolition in Yakima: questions

Do you take out the concrete footings too?
We can cut post bases flush at ground level or pull the concrete footings out completely. Pulling piers requires extra digging and heavy equipment, so let us know your preference when requesting your initial quote.
What happens to the wall where the deck was attached?
We carefully unbolt the main ledger to keep your exterior wall intact. Removing the ledger exposes open lag bolt holes and older siding. Sealing those holes and repairing house siding is finish carpentry work for your builder.
Can you remove a second-story deck?
Yes. Our crew handles elevated platforms attached to second-floor doors. We use safety staging, fall protection equipment, and controlled hand-lowering methods to take the frame down safely without hitting lower windows or patio doors.
Do I need to pull a permit for deck teardown?
Permit rules vary based on structure height and how it attaches to the house. If you are replacing the platform, your new construction permit often includes removal. Check with your local building department for specific requirements.
Will your crew leave loose nails or screws in my yard?
No. We perform a magnetic sweep across the work site, garden beds, and access pathways after loading the wood into our truck to collect loose hardware and metal scraps.
How does summer heat affect old deck structures here?
Intense dry sun bakes moisture out of framing lumber, causing boards to cup, split, and pull away from fasteners. This speeds up structural failure and makes old boards prone to splintering under foot traffic.
Can you tear down a deck if there is an AC unit underneath?
Yes. We work around heat pumps, gas meters, irrigation lines, and window wells. We use hand rigging and controlled cuts to remove overhead joists without dropping timber on your home systems.

Get a quote in Yakima

Tell us what you have and where it sits. We handle the loading.

No obligation. We come to you and quote on the spot.

Nearby towns we serve

  • Terrace Heights, WA3.2 mi
  • Union Gap, WA3.4 mi
  • Selah, WA3.8 mi
  • Ahtanum, WA6.2 mi
  • Gleed, WA6.4 mi
  • Summitview, WA6.5 mi
  • Moxee, WA6.7 mi
  • Wapato, WA11.4 mi

Other services in Yakima

Explore